Post Curing Inflator (PCI) Unit
Fully automated post-curing inflator with pneumatic centering, adjustable overstroke and standalone compatibility.
Machine information
The VS Tyre Machinery Post Curing Inflator (PCI) Unit is designed for post-curing operations with automated control, pneumatic tyre centering and compatibility with existing presses as a standalone PCI unit.
Designed around the production task.
Durable streamlined design
Low-maintenance operation
Precision and stability
Fully automated operation
Adjustable overstroke via LVDT
Compatible with a wide range of existing presses
Where this machine fits.
Specifications
| Tyre Size Bead Range | 8” - 25” |
|---|---|
| Working Pressure Range | 30 PSI - 116 PSI |
| Tyre Diameter Range | 450 mm - 1350 mm |
| Tyre Loading / Unloading | Manual |
| Tyre Centering | Pneumatically operated |
| Tyre Width | 120 mm - 450 mm |
| Post Curing Timer | 0 - 120 min |
| Outer Rim Drive | 2.2 kW AC motor with brake, GB 205 RPM |
| Post Curing Media | Compressed air |
| Controls | Siemens |
| Safety | Interlocks via pressure switch and delay timers |
Published specifications are a technical reference. Final dimensions, capacity, utilities and configuration should be confirmed for your application before order.
Frequently asked questions
What information should I share for a technical enquiry?
Share the machine or process you are considering, tyre range or product range, expected capacity and any existing equipment details. The more practical context you provide, the easier it is to review the requirement.
Can the machine configuration be discussed for our application?
Yes. Machine configuration should be reviewed around the application, dimensions, capacity, utilities and existing production setup before final selection.
Can you confirm the final technical specification before order?
Yes. Published catalogue information should be treated as an initial technical reference. Final dimensions, capacity, utilities and configuration should be confirmed during the engineering and quotation process.
Can existing equipment be considered in the proposal?
Yes. Existing machinery, plant layout, utilities and integration requirements can be included as part of the technical discussion.
Need a configuration check?
Send the machine name, tyre range, production requirement and any existing equipment details to the VS Tyre Machinery team.




